Storming Media: Pentagon Reports and DocumentsPentagon Reports: Fast. Definitive. Complete.     
New Account »
Forgot Password?
Advanced Search »

Newsletter
Unsubscribe »
Reports by Keyword(s)ENVIRONMENTAL IMPACT STATEMENTS
Total Results: 629 Pages: Previous  2 3 4 5 6 [7] 8 9 10 11 12 Next Results per page:
Sort by: Title Date Desc Pages Display:
Draft Environmental Impact Statement, West Bank Hurricane Protection Levee, Jefferson Parish, Louisiana FEB 1984
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Jefferson Parish, located in southeast Louisiana, without an adequate hurricane protection levee system for the populated areas in the southern part of the parish. The purpose of this document is to determine the environmental consequences of providing this hurricane protection. Seven levee alinements were studied. Constructing the levee would cause the impoundment of from 429 to 2,729 acres of wetlands, depending on the alinement, and the subsequent blockage of free ...


New Orleans to Venice, Louisiana Hurricane Protection Project, Draft Supplemental Environmental Impact Statement FEB 1984
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Plaquemines Parish, Lousiana, is composed of the lands adjacent to the Mississippi River below New Orleans, Louisiana. The New Orleans District has been directed by Congress to provide hurricane protection for the residents of Plaquemines Parish. The west bank portion of the project from Tropical Bend south to Venice is currently under construction by the sand core, hydraulic clay method, while work from Tropical Bend north to City Price has ...


New Orleans to Venice, Louisiana Hurricane Protection Project, Draft Supplemental Environmental Impact Statement. Appendixes FEB 1984
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Contents: Coastal Zone Management Consistency Determination; Water Quality; Mitigation; Modified Man-day and Habitat Analysis; US Fish and Wildlife Service Draft Fish and Wildlife Coordination Act Report; Biological Assessment of Threatened and Endangered Species; Cultural Resources.


Final Environmental Impact Statement, Peacekeeper in Minuteman Silos, F. E. Warren AFB, Wyoming. Volume 1 JAN 84
Authors:  AIR FORCE REGIONAL CIVIL ENGINEER-MX NORTON AFB CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This Final EIS (FEIS), Volume I, addresses the placement of Peacekeeper Intercontinental Ballistic Missiles (ICBMs) in refurbished Minuteman III silos at F E Warren AFB, Wyoming. This FEIS describes potential environmental changes to the following environmental resources: employment demand, housing, public finance, construction resources, social well-being, public services and facilities utilities, energy resources, transportation, land use, recreation, cultural resources, visual resources, water resources, biological resources, threatened and endangered species, geologic ...


Final Environmental Impact Statement, Peacekeeper in Minuteman Silos, F. E. Warren AFB, Wyoming. Volume 2. Public Comments JAN 84
Authors:  AIR FORCE REGIONAL CIVIL ENGINEER-MX NORTON AFB CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This volume of the Final EIS contains the Public Comments on the Draft EIS, the issues raised, and the answers to those issues. Keywords: Guided missile silos; Wyoming, Environmental impact statements; Surface to surface missiles; Strategic weapons; Air Force facilities.


General Reevaluation and Environmental Impact Statement for Flood Control and Related Purposes, Sheyenne River, North Dakota JAN 1984
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report addresses the water resource and related problems and needs of the lower Sheyenne River basin with particular emphasis on reducing flood damages. The main report summarizes the water resource and related problems and needs of the basin, the alternatives evaluated, the process used to develop and select a plan, conclusion and recommendations, and the environmental impact statement.


Draft Environmental Impact Statement, San Francisco Bay to Stockton, California Project. John F. Baldwin Ship Channel. Phase II. Central San Francisco Bay Segment DEC 1983
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The purpose of this report is to recommend for construction, a plan of improvements for the Central San Francisco Bay segment of the John F. Baldwin Ship Channel. This project is part of the San Francisco Bay to Stockton Project authorized by Congress in 1965. Advanced engineering and design and construction of the John F. Baldwin Ship Channel is proceeding in three phases. Phase I was constructed in 1974 and ...


Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 1. Main Report. Revised DEC 1983
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Ohio Department of Natural Resources (ODNR) is developing a multiuse facility on the shore of Lake Erie near Toledo, OH, called Maumee Bay State Park. They have requested Corps assistance in designing and cost-sharing structures to halt the severe shoreline erosion which is occuring, so that the park can be developed to its full potential. A plan for accomplishing the stated purpose has been developed. It would provide a ...


Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 2. Appendices. Revised DEC 1983
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Appendices: Geotechnical Designs; Economic Evaluation; Cost Estimates; Design and Coastal Processes; Correspondence; Public Involvement; Fish and Wildlife Report; Cultural Resources; Environmental and Wetland Report; Public Views and Responses.


Feasibility Report and Final Environmental Impact Statement, Wisconsin River at Portage, Wisconsin, Feasibility Study for Flood Control. Appendixes DEC 1983
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The appendices accompany the main report with develops a flood control plan for the Portage, Wisconsin area, in those areas affected by the Wisconsin River and backwater flooding in the lower reaches of the Baraboo River and Duck Creek. The appendices are: Appendix A--Plan Formulation; Appendix B-- Hydrology; Appendix C--Hydraulics; Appendix D--Interior Flood Control; Appendix E--Geotechnical Investigations; Appendix F--Social and Economic Analysis; Appendix G--Cultural and Environmental Resources; Appendix H--Recreation and ...


Final Environmental Impact Statement. Mankato-North Mankato-Le Hillier Flood Control. Phase I (As Amended 18 January 1972). Final Supplement II-C NOV 1983
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The St. Paul District is constructing flood control works (now largely complete) on the Manketo and Blue Earth Rivers to protect developed floodplain portions of Mankato, North Mankato, and Le Hillier from frequency flood damage. These flood control works include the raising of bridges to clear the high water of the standard project flood. Two Chicago and North Western Transportation Company railroad bridges over the Blue Earth River must be ...


Final Programmatic Environmental Impact Statement, Lake Darling Flood Control Project, Souris River, North Dakota and Final Feature Environmental Impact Statement, Velva Flood Control, Velva, North Dakota NOV 1983
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The proposed Lake Darling flood control project (authorized by the 1982 Energy and Water Development Act) consists of an approximately 4-foot raise of Lake Darling plus associated upstream and downstream flood control measures, including those at Velva, North Dakota. This programmatic EIS covers all project features. In addition, a site-specific EIS for the Velva portion of the project follows this programmatic EIS. A site-specific EIS for the Lake Darling features ...


Terrebonne Parish-Wide Forced Drainage System, Terrebonne Parish, Louisiana AUG 1983
Authors:  H. Thibodeaux; R. Duke; ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The forced drainage plan consists of 26 proposed and 5 unauthorized projects. The latter projects were begun about the time that Federal wetland permitting procedures were being initiated. All projects were designed to provide controlled drainage for existing and future development along natural levees (the high ground) in the parish. The projects were not designed to protect against major floods but will provide protection against minor floods. Alternative levee alignments ...


Environmental Impact Analysis Process. Supplement to Final Environmental Impact Statement Space Shuttle Program, Vandenberg AFB, California JUL 83 708 pages
Authors:  DEPARTMENT OF THE AIR FORCE WASHINGTON DC
The full text of this report is available for sale.The Supplement to the Final Environmental Impact Statement for the Space Shuttle Program at Vandenberg AFB updates environmental information arising from additional environmental analyses and proposed program changes subsequent to January 1978. New or revised action aspects are examined for significant effects on the environment of Vandenberg and surrounding areas. Major impacts include cutting through a portion of one archaeological site at Vandenberg AFB; removing one of three structures from ...


Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed JUL 1983
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This final feasibility report on the Tonawanda Creek Watershed is an interim reply to the study authorization which requested determination of the feasibility of providing flood protection in the Buffalo Metropolitan Area, N.Y. The study area is located in Western New York State and includes an area of 511 square miles. The existing flooding problem causes nearly $3.0 million in average annual damages to existing urban and agricultural development. A ...


Feasibility Study and Environmental Impact Statement, Oakland Inner Harbor, California, Deep-Draft Navigation JUN 1983
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The purpose of this study is to investigate navigation conditions at Oakland Inner Harbor and to determine whether the provision for improvement of existing deep-draft channels is advisable. Oakland Inner Harbor Channel provides deep-draft access for the Port of Oakland. It wad found that the growth of foreign and coastwise shipments and the introduction of larger vessels in the World Pacific Basin Fleet have rendered the existing Federal project channel ...


Lorain Harbor, Ohio. Lorain Small-Boat. Volume II. Main Report and Draft Environmental Impact Statement MAY 1983
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report documents results of the study conducted to investigate the small-boat harbor needs at Lorain, Ohio. This report evaluates various alternatives considering benefits, cost, and social and environmental considerations in order to develop a plan which warrants construction. (Author)


Draft Environmental Impact Report/Environmental Impact Statement. Cullinan Ranch Specific Plan. Appendices MAY 1983
Authors:  TORREY AND TORREY INC SAN FRANCISCO CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report is a joint State/Federal environmental impact document concerning a regulatory permit application by Pan Pacific and Redwood Realty under Section 10 of the River and Harbor Act of 1899 and Section 404 of the Clean Water Act. The proposed project involves a water-oriented predominantly residential community with public and private marina facilities.


Draft Environmental Impact Report/Environmental Impact Statement. Cullinan Ranch Specific Plan MAY 1983
Authors:  TORREY AND TORREY INC SAN FRANCISCO CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Pan Pacific and Redwood Realty has applied to the U.S. Army Corps of Engineers, San Francisco District, for a permit under Section 10 of the River and Harbor Act of 1899 and Section 404 of the Clean Water Act to construct a water-oriented residential community on 1493 acres with public and private marina facilities. Approximately 3 million cubic yards of material would be excavated from the site to form channels ...


Allocentric versus Idiocentric Social Behavior: A Major Cultural Difference between Hispanics and the Mainstream MAR 1983
Authors:  Harry C. Triandis; ILLINOIS UNIV AT URBANA DEPT OF PSYCHOLOGY
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Numerous findings, reported in previous reports of this project, converge and point to a major cultural difference between U.S. Hispanics and Mainstream individuals. Hispanics are allocentric--their behavior is strongly influenced by consideration of how it will affect other people--while Mainstream individuals are idiocentric--they give more weight to the effect that the behavior will have on them than on others. This dimension corresponds to the collectivism-individualism dimension discussed in the literature. ...


Cost Estimating Relationships for Real Property Maintenance Activity at Army Installations JAN 1983
Authors:  Myron G. Myers; Paul R. McClenon; William A. Woodring; LOGISTICS MANAGEMENT INST WASHINGTON DC
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report describes cost estimating relationships developed for Real Property Maintenance Activities (RPMA) at Army installations. Cost estimating relationships are presented for total RPMA and subcategories of RPMA as functions of variables determined to significantly influence incurred costs. A sample of 96 Army installations within CONUS during FY81 was used to construct the cost estimating relationships. Findings with respect to cost determined, economies of scale and application potential for estimating ...


Development of a Permitting Strategy for a Coal-Fired Heating Plant, K. I. Sawyer AFB, Maine DEC 1982
Authors:  ENGINEERING-SCIENCE FAIRFAX VA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report develops air pollution design criteria and a corresponding permitting strategy for a candidate coal-fired heating plant. The optimum strategy and fallback strategies are supported by the appropriate calculations and air quality analyses. (Author)


Red River Waterway, Louisiana, Texas, Arkansas, and Oklahoma, Mississippi River to Shreveport, Louisiana. General Reevaluation Report DEC 1982
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Red River Waterway (RRWW) project area is a region specialized in agriculture, mining, small industry, and local-serving businesses. the alluvial valley is characterized by meander belt deposits and lakes related to river migration. The dominant topographic highs are the natural and artificial levees; the lows are the backwater areas and filled-in channels. The present Red River is characterized by a meandering water course and is a threat to agricultural ...


Preference Migration, A Case Study: Motivation Factors Behind the Decision Making Process of Army Officers 29 NOV 1982
Authors:  Charles F. Rey; ARMY MILITARY PERSONNEL CENTER ALEXANDRIA VA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This thesis is an exploratory case study of the role of environmental and physical factors as they influence the military officer's migration decision making process. The purpose of this research is to evaluate the locational preferences and motivating factors behind the decisions of these migrants.


Geographic Perspectives on the Relationship of Air Force Base Realignments to Rural Community Welfare in the United States 15 NOV 1982
Authors:  Stephen Franklin Burrell; AIR FORCE INST OF TECH WRIGHT-PATTERSON AFB OH
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Small towns in rural locations expect socioeconomic trauma when military bases in their hinterlands are closed. The purpose of this research is to learn how three small communities were affected by closure of their adjacent Air Force bases and to explain the role played by location as an influence on community revival efforts after base closure. Explaining socioeconomic relationships between the host community and its nearby military base as an ...


Sugar Creek Basin North Carolina and South Carolina, Feasibility Report and Environmental Impact Statement for Water Resources Development OCT 82
Authors:  CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Report of investigations to determine feasibility of providing flood control and related water resource improvements on various streams within the Sugar Creek Basin, North Carolina and South Carolina. The report recommends construction of a combination of structural and non-structural flood damage prevention measures and discusses the impacts of implementation.


Final Environmental Impact Statement (As Amended 18 January 1972) Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Flood Control. Phase I. Final Supplement II-A OCT 1982
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The St. Paul District, Corps of Engineers is currently construction flood control works on the Minnesota and Blue Earth Rivers to protect developed portions of the floodplain in Mankato, North Mankato and Le Hillier from frequent flood damage. These works include raising bridges to clear the high water of the standard project flood. The two Trunk Highway 169/60 bridges over the Blue Earth River must be raised or replaced to ...


Draft Programmatic Environmental Impact Statement, Lake Darling Flood Control Project, Souris River, North Dakota and Draft Feature Environmental Impact Statement Velva Flood Control, Velva, North Dakota OCT 1982
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The proposed Lake Darling flood control project, authorized by the 1982 Energy and Water Development Act, consists of an approximate 4-foot raise of Lake Darling and associated upstream and downstream flood control measures, including Velva, North Dakota. This programmatic EIS covers all project features. In the St. Paul District has been investigating flood control alternatives for the Souris River since 1963. A channel modification project in Minot was authorized in ...


Wynoochee Hydropower/Fish Hatchery: Feasibility Report and Environmental Impact Statement 30 SEP 1982
Authors:  James O. Waller; CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Presents results of a feasibility study on the desirability of developing the hydropower potential and fish enhancement opportunities at Wynoochee Dam, Washington. Recommended plan is an 11.3 megawatt hydropower addition which would produce an average 36,900 megawatt hours energy per year and a 405,000 - pound hatchery for anadromous fish which would add 127,500 adult fish to the annual harvest. Investment cost would be $43,410,000 (October 1981) of which $23,420,000 ...


Environmental Program Guidebook. 24 SEP 1982
Authors:  ARMY TRAINING AND DOCTRINE COMMAND FORT MONROE VA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Ths purpose of this book is to outline responsibilities and to provide a working guide for commanders and staff personnel involved in the supervision and administration of TRADOC installation environmental programs. This publication encompasses the laws, directives, and regulations governing air pollution, water pollution, noise abatement, solid waste disposal and recycling, hazardous and toxic material management, cultural resources, and endangered species. The current status of the various environmental programs for ...


Compendium of Administrators of Land Use and Related Programs. Revision SEP 1982
Authors:  L. A. Engelman; J. J. Fittipaldi; R. M. Lacey; H. E. Balbach; CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report is primarily a compendium of the names, addresses, and telephone numbers of Federal agency and State government officials having control over, or interest in, land use and plans and programs related to land use. It provides for the Army preparer of EAs and EIS a point of contact who can answer questions about applicable policies at an early stage of project planning determination of the appropriate lead/cooperating agency; ...


Draft Environmental Impact Report/Environmental Impact Statement, Bel Marin Keys Unit 5. Appendices SEP 1982
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report is a Joint State/Federal environmental impact document concerning a regulatory permit application by Home Savings & Loan under Section 10 the River and Harbor Act of 1899 and Section 404 of the Clean Water Act. The proposed project involves waterfront residential/commercial development on approximately 735 acres with an additional estimated 875 acres to be committed to open space and environmental enhancement. (Author)


Draft Environmental Impact Report/Environmental Impact Statement, Bel Marin Keys Unit 5 SEP 1982
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Home Savings and Loan Association has applied to the U.S. Army, Corps of Engineers, San Francisco District, for a permit under Section 10 of the River and Harbor Act of 1899 and Section 404 of the Clean Water Act authorizing the excavation of approximately 9,000,000 cubic yards of earth to construct a 546 acre lagoon. The excavated material would be used to construct streets, levees and building pads for 1178 ...


Preliminary Investigation of a Proposed Pearl River Cutoff through the Old Jackson Sanitary Landfill SEP 1982
Authors:  Don R. Alexander; Charlie Whitten; ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MS GEOTECHNICAL LAB
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Solutions are presently being sought to reduce flooding along the Pearl river in the Jackson, Miss. area. Geotechnical considerations for one particular alternative are reported herein. A cutoff channel through the old Jackson Sanitary landfill would considerably reduce the stage of the Pearl River. Problems stemming from environmental restrictions might include lining the channel with a low permeability material to prevent leachate infiltration from the landfill into the river. Soil ...


Flood Control Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Final Supplement II-B to the Final Environmental Impact Statement for Bridge Relocations. Main Street, Trunk Highway 60 Bridge over the Minnesota River between Mankato and North M SEP 1982
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The St. Paul District is currently constructing flood control works on the Minnesota and Blue Earth Rivers to protect developed portions of the floodplain in Mankato, North Mankato, and Le Hillier from frequent flood damage. These works include the raising of bridges to clear the high water of the standard project flood. The Main Street bridge over the Minnesota River must be raised or replaced to an elevation approximately 30 ...


An Analysis of the F-16 Aircraft Requirements Generation Process and Its Adverse Impact on Contractor Rate Capacity SEP 1982 120 pages
Authors:  Charles M. Reynolds Jr.; Richard D. Schikora; AIR FORCE INST OF TECH WRIGHT-PATTERSON AFB OH SCHOOL OF SYSTEMS AND LOGISTICS
The full text of this report is available for sale.The United States defense industry is experiencing frustration in agglomerating planned Department of Defense production requirements. One probable source of this frustration is inadequate requirement forecast consolidation by the Department of Defense. Several agencies within the Department of Defense are charged with procuring subassemblies and spares for major weapons systems. In the case of the United States Air Force F-16, the Air Force Logistics Command and the Air Force Systems ...


Proposed Expansion of Acme Landfill Operations AUG 1982
Authors:  TORREY AND TORREY INC SAN FRANCISCO CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report is joint State/Federal environmental impact document concerning a regulatory permit application by Acme Fill Corp. under Section 10 of the River and Harbor Act of 1899 and Section 404 of the Clean Water Act. The proposed project consists of the expansion of an existing sanitary landfill operation into a 200-acre wetland area adjacent to Walnut and Pacheco Creeks near Martinez, CA.


Installation Restoration Program Records Search for Langley Air Force Base, Virginia JUN 1982 205 pages
Authors:  CH2M HILL GAINESVILLE FL
The full text of this report is available for sale.CH2M HILL was retained by the Air Force Engineering and Services Center (AFESC) on January 26, 1981 to conduct the Langley AFB Records Search under Contract No. F08637 80 G0010 0001. The identification of hazardous waste disposal sites at military installations was directed by Defense Environmental Quality Policy Memorandum 80-6 dated June 1980, and implemented by Air Force message dated December 2, 1980, as a positive action to ensure compliance ...


Draft Feasibility Report and Draft Environmental Impact Statement, East, West and Duwamish Waterways Navigation Improvement Study JUN 1982
Authors:  CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The need for improving the existing federal navigation channels in the East, West, and Duwamish Waterways at Seattle, Washington is reported. Continued growth in waterborne commerce is forecast for Seattle Harbor for 1990 to 2000. Existing safety problems and the need for more efficient water transport will intensify. The Recommended Plan would increase the authorized depth of the East and West Waterways from 34 feet to 39 feet. The existing ...


Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation JUN 1982
Authors:  CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The study determined the need for and feasibility of improving the safety and efficiency of deep-draft water in Grays Harbor, Washington. Features of the tentatively recommended plan include the following: (1) 24.3 miles of channel improvement form the outer bar through the harbor entrance and estuary past the city of Aberdeen and up the Chehalis River to the town of Cosmopolis (Authorized chanel depth would range from 46 feet at ...


Weyerhaeuser Export Facility at DuPont. Volume III. Appendices R - T MAY 1982
Authors:  URS CO SEATTLE WA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Weyerhaeuser Company proposes to construct and operate a 250-acre export facility within the City of DuPont, WA to ship forest products from manufacturing and wood operations in western Washington to offshore markets. In 1976, Weyerhaseuser purchased a 3,200-acre site for this purpose. The E. I. DuPont de Nemours and Company used this site for the manufacture and ocean shipping of commercial explosives since 1909. Construction and operation of the proposed ...


North Bay Aqueduct (Phase II Facilities), Solano County, California. Regulatory Permit Application Made by the California Department of Water Resources to the U.S. Army Corps of Engineers, Public Notice 12950-58 MAY 1982
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Department of Water Resources' preferred alternative includes the Route 1 alignment of the North Bay Aqueduct plus urban water conservation programs that will be implemented through enforceable institutional means. This alignment diverts Sacramento-San Joaquin Delta water for M and I use in Solano and Napa countries from Cache Slough in eastern Solano County by underground pipeline to tie into existing Phase I aqueduct facilities near Cordelia, California. The measures ...


Public Water Supply, Red River Parish, Louisiana APR 1982
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Red River Parish, located in northwest Louisiana, is without an adequate supply of good quality potable water. This Environmental Impact Statement addresses alternatives which would produce a new source of water and a resulting increase in economy through new industry and residential growth. From a total of 11 alternatives considered, two alternatives were considered by the U.S. Corps of Engineers to be reasonable alternatives. The two reasonable alternatives discussed in ...


Sand Dredging Operations in Lafourche Parish, Near Leeville, Louisiana APR 1982
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.In the general area of Terrebonne and Lafourche Parishes, and Grand Isle, Louisiana, sand for fill is obtained from small existing sand pits and/or the Mississippi River. The Plaisance interests and the Picciola interests, in separate applications, applied for permits pursuant to Section 10 of the River and Harbor Act of 1899 and Section 404 of the Clean Water Act to dredge sand from wetlands of lower Lafourche Parish and ...


Installation Restoration Program. Phase I - Records Search, Robins AFB, Georgia APR 1982
Authors:  ENGINEERING-SCIENCE INC ATLANTA GA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Department of Defense (DOD) has developed a program to identify and evaluate past hazardous material disposal sites on DOD property, to control the migration of hazardous contaminants, and to control hazards to health or welfare that may result from these past disposal operations. This program is called the Installation Restoration Program (IRP). Thirteen disposal sites located on the Robins AFB property were identified as containing hazardous waste resulting from ...


Flood Control, State Road and Ebner Coulees, La Crosse, Wisconsin, General Design Memorandum. Phase I. Plan Formulation and Hydrology and Draft Environmental Impact Statement APR 1982
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report and EIS reevaluate and update studies contained in a survey report, dated 3 November 1967, and a draft phase I general design memorandum (GDM) dated November 1976. For State Road Coulee recommended channel modifications include rectangular and trapezoidal concrete, channels from Hagen Road bridge to just downstream of the Burlington Northern railroad bridge, and a concrete and riprap channel with outlet control between the railroad bridge and the ...


Detailed Project Report and Environmental Impact Assessment for Lakeshore Park, Ashtabula, Ohio Beach Erosion Control and Shoreline Protection Study. Stage III Documentation. Main Report APR 1982
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Lakeshore Park consists of approximately 50 acres of lakefront property located in the township of Ashatbula, Ohio. The Buffalo District has investigated public concerns of the Lakeshore Park study area related to shoreline protection and restoration of a recreational beach. Among other plans considered, two were selected for detailed study: alternative 2, consisting of a three-breakwater system protecting 800 feet of beachfill; and alternative 1, the no-action plan, would provide ...


Irondequoit Creek Watershed New York, Final Feasibility Report and Environmental Impact Statement MAR 1982
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Irondequoit Creek has had a recorded history of flooding for more than a hundred years. The increasing urbanization and encroachment into the plain has increased the flood damage costs in recent years. Twenty floodprone areas in the Irondequoit Creek Watershed were identified in a survey completed in 1968 by the Corps of Engineers, Buffalo district. The 20 floodprone areas were reviewed and evaluated to determine if there was a need ...


Installation Restoration Program. Phase I. Records Search, Kelly AFB, Texas FEB 1982
Authors:  ENGINEERING-SCIENCE INC ATLANTA GA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Presented in this report are introductory background information on the Installation Restoration Program, a description of the Kelly AFB setting, a review of industrial and research and development activities at Kelly AFB, an inventory of major solid and hazardous waste from past activities, a review of past waste handling, treatment and disposal facilities and an evaluation of the pollution potential of each identified site.


Detailed Project Report and Environmental Impact Assessment for Lakeshore Park, Ashtabula, Ohio Beach Erosion Control and Shoreline Protection Study. Stage III Documentation. Main Report FEB 1982
Authors:  CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Lakeshore Park consists of approximately 50 acres of Lakefront property located in the township of Ashtabula, Ohio. The Buffalo District of the Corps of Engineers has investigated public concerns of the study area related to shoreline, beach and bluff erosion. Several alternative plans were studied to address the erosion problem. The tentatively selected plans consists of three offshore rubblemound breakwaters and an 800 foot recreational beach. That plan would best ...


Total Results: 629 Pages: Previous  2 3 4 5 6 [7] 8 9 10 11 12 Next Results per page: