Storming Media: Pentagon Reports and DocumentsPentagon Reports: Fast. Definitive. Complete.     
New Account »
Forgot Password?
Advanced Search »

Newsletter
Unsubscribe »
Reports by Keyword(s)ENVIRONMENTAL IMPACT STATEMENTS
Total Results: 629 Pages: Previous 1 2 3 4 [5] 6 7 8 9 10 11 Next Results per page:
Sort by: Title Date Desc Pages Display:
Assessment System for Aircraft Noise (ASAN): Development of Alpha-Test Prototype System Software FEB 90
Authors:  Nicholaas H. Reddingius; John S. Smyth; BBN SYSTEMS AND TECHNOLOGIES CORP CANOGA PARK CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This document describes the Alpha-Test version of the Assessment System for Aircraft Noise (ASAN). ASAN was developed for the United States Air Force's Noise and Sonic Boom Impact Technology Advanced Development Program Office (NSBIT ADPO). The Purpose of ASAN is to provide Air Force route and environmental planners with a set tools for preparing the noise portion of environmental impact statements (EIS), environmental assessments (EA), and findings of no significant ...


Closure of Chanute Air Force Base FEB 90
Authors:  DEPARTMENT OF THE AIR FORCE WASHINGTON DC
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The action evaluated in this Environmental Impact Statement (EIS) is the closure of Chanute Air Force Base, Illinois. The closure is the result of the recommendations of the Defense Secretary's Commission on Base Realignment and Closure, of legislative requirements in the Base Closure and Realignment Act (Public Law 100-526), and of U.S. Air Force plans to enhance mission readiness and national security. Primarily, the closure of Chanute Air Force Base ...


Environmental Impact Analysis Process. Draft Environmental Assessment. SAC Low-Altitude Flight Operations at the Airburst Range, Colorado 26 JAN 90 170 pages
Authors:  STRATEGIC AIR COMMAND OFFUTT AFB NE
The full text of this report is available for sale.This environmental assessment (EA) examines the potential environmental impacts of U.S. Air Force Strategic Air Command (SAC) flights along low-level military training route (MTR) IR-409 and low-altitude weapons training operations at the Airburst Range in southcentral Colorado. Low-altitude flight operations are essential to the Air Force for a diversity of activities ranging from pilot and navigator training to research, development, test, and evaluation programs. The Air Force requires use of ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 7. Appendix J. Feasibility Study and EIS/EIR Comments and Responses. Section B. Attachments DEC 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The main report and environmental impact statement report summarizes the coastal flooding problems in the study area and alternative solutions; describes the selected plan and implementation responsibilities of the selected plan, and identifies environmental resources in the study area and potential impacts of alternative solutions. This volume (Appendix I) includes all letters between community officials, agencies, organizations and the public and the Corps prior to agency and public review of ...


Saugus River and Tributaries Flood Damage Reduction Study; Lynn, Malden, Revere and Saugus, Massachusetts. Section 2. Final Environmental Impact Statement and Final Environmental Impact Report DEC 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report summarizes the coastal flooding problems in the Saugus River and tributaries area and the possible alternative solutions; this volume identifies environmental resources in the study area and the potential impacts of alternative solutions as required by the Federal (NEPA) and state (MEPA) environmental processes. Keywords: Flood control; Flooding; Floods; Estuaries; Shores; Coastal regions; Hydrology. (sdw)


Saugus River and Tributaries Flood Damage Reduction Study: Lynn, Malden, Revere and Saugus, Massachusetts. Section 1. Feasibility Report DEC 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report describes possible solutions to the coastal flooding problems in the Saugus River and its tributaries. This recommended Regional Saugus River Floodgate Plan is economically justified and will maximize net economic benefits. The plan is also technically feasible. Keywords: Environmental impact statement; Flood control; Flooding; Floods; Flood plains; Estuaries; Ocean Tides; Tidewater; Shores; Weirs. (jhd)


Superconducting Magnetic Energy Storage (SMES-ETM) System. Environmental Impact Assessment Process Implementation Plan 28 NOV 89 61 pages
Authors:  DEFENSE NUCLEAR AGENCY WASHINGTON DC
The full text of this report is available for sale.This Environmental Impact Assessment Process Implementation Plan provides the framework within which an environmental assessment (EA) will be prepared for the SMES-ETM Program. Should a determination be made at a later date that an environmental impact statement (EIS) will be necessary, this EIAP Implementation Plan will also serve as the framework for that effort. This framework provides a means of managing and documenting the SMES-ETM environmental process so as to ...


Preparation of Environmental Assessment and Probable Finding of No Significant Impact for Sheppard Air Force Base, Texas, Realignment NOV 89 51 pages
Authors:  CORPS OF ENGINEERS TULSA OK TULSA DISTRICT
The full text of this report is available for sale.This Environmental Assessment was prepared by the U.S Army Corps of Engineers, Tulsa District in response to a request by the U.S. Air Force. The action to be assessed involves a troop realignment at Sheppard AFB, Wichita Falls, Texas. Approximately 2,300 military personnel will be transferred to that base over an approximate three year period. Approximately $88,000,000 worth of construction will be required to accommodate the realignment requirements. Impacts will ...


Definite Project Report for Section 205 Flood Control, Illinois River, Liverpool, Illinois, with Final Environmental Impact Statement OCT 89
Authors:  ARMY ENGINEER DISTRICT ROCK ISLAND IL
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report presents the results of an investigation of the flooding problems along the Illinois River within the village limits of Liverpool, Illinois. The village initially requested an investigation in a letter to the Rock Island District dated January 18, 1983 (appendix F). A reconnaissance report was completed in February 1985. This study was initiated in April 1985.


Disposal Site Selection Technical Appendix. Phase 2. (North and South Puget Sound) SEP 89
Authors:  David Kendall; David Jamison; John Malek; Paula Ehlers; CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This document is a technical appendix to both the Proposed Management Plan Report and the Environmental Impact Statement (EIS) for the Puget Sound Dredged Disposal Analysis (PSDDA) Phase II study covering north and south Puget Sound. Results of disposal site selection studies for Phase II of PSDDA, are summarized herein. Phase II includes the southern portion of Puget Sound south of the Tacoma Narrows and the northern portion of Puget ...


Environmental Assessment of the Proposed Force Structure Changes at Eaker Air Force Base, Arkansas AUG 89 28 pages
Authors:  CIVIL ENGINEERING GROUP ( 97TH) EAKER AFB AR ENVIRONMENTAL PLANNING
The full text of this report is available for sale.This Environmental Assessment (EA) examines the consequences of the proposed force structure changes and facility construction at Eaker Air Force Base (AFB), Arkansas. The assessment was prepared in compliance with Air Force Regulation (AFR) 19-2, which implements the National Environmental Policy Act (NEPA) and the council on Environmental Quality (CEQ) regulations. The purpose of the EA is to provide a description and evaluation of the potential consequences of the proposed ...


Final Environmental Impact Statement. Second KC-135R Air Refueling Squadron, Malmstrom Air Force Base, Montana JUL 89 157 pages
Authors:  DEPARTMENT OF THE AIR FORCE WASHINGTON DC
The full text of this report is available for sale.The United States Air Force proposes to deploy a Second KC-135R, Air Refueling Squadron consisting of 14 additional tanker aircraft, at Malmstrom ARB, Montana. The aircraft will arrive in late 1991 and will bring the total number of assigned KC-135R aircraft to 30. Except for normal localized traffic patterns, the aircraft will fly more than 3,000 feet above ground, using existing established and approved airways and routes. Because no other ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 5. Appendix I. Planning Correspondence: U.S. Congress, State Legislature, Federal and State Agencies JUN 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The main report and environmental impact statement report summarizes the coastal flooding problems in the study area and alternative solutions. It describes the selected plan and implementation responsibilities of the selected plan, and identifies environmental resources in the study area and potential impacts of alternative solutions. This volume (Appendix I) includes all letters between community officials, agencies, organizations and the public and the Corps prior to agency and public review ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 2. Appendix B. Hydrology and Hydraulics. Appendix C. Water Quality JUN 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The main report and environmental impact statement/report summarizes the coastal flooding problems in the study area and alternative solutions. It describes the selected plan and implementation responsibilities of the selected plan, and identifies environmental resources in the study area and potential impacts of alternative solutions. Appendix B includes descriptions of: the tidal hydrology and hydrology of interior runoff in the study area, and of wave runup and seawall overtopping, interior ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 1. Appendix A. Plan Formulation JUN 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The main report and environmental impact statement/report summarizes the coastal flooding problems in the study area and alternative solutions. It describes the selected plan and implementation responsibilities of the selected plan; and identifies environmental resources in the study area and potential impacts of alternative solutions. This volume (Appendix A) provides detailed information on the coastal flooding problem and the alternatives investigated. It includes: sensitivity analyses on floodgate selection (including location ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 3. Appendix D. Design and Costs. Appendix E. Geotechnical. Appendix F. Real Estate JUN 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This volume consists of three appendices to the main report and environmental impact statement/report. Appendix D includes: detailed descriptions, plans and profiles and design considerations of the selected plan; coastal analysis of the shorefront; detailed project costs; scope and costs of engineering and design; scope and costs of operation and maintenance; and design and construction schedules. Appendix E describes geotechnical and foundation conditions in the study area and the design ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 4. Appendix G. Economics. Appendix H. Socioeconomic JUN 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This volume consists of two appendices to the main report and environmental impact statement/report. Appendix G describes recurring and average annual damages and benefits in study area floodzones, economic analysis and optimization of alternative plans. Appendix H describes the socioeconomic conditions in the study area and the affects of the selected plan on development in the floodplain and estuary. Keywords: Massachusetts coastal engineering; Environmental impact statements; Flood control; Flooding/economic impact. ...


Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 6. Appendix I. Planning Correspondence: Lynn, Malden, Revere, Saugus, Interest Groups, and News Articles JUN 89
Authors:  Robert Hunt; CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This appendix includes all letters between community officials, agencies, organizations and the public and the Corps prior to agency and public review of the draft report. Keywords: Massachusetts coastal engineering; Public opinion; Army Corps of Engineers; Floods; Estuaries; Flood control; Environmental impact statements; Urban planning. (EDC)


Draft Environmental Impact Statement: Second KC-135R Air Refueling Squadron, Malmstrom Air Force Base, Montana MAY 89
Authors:  DEPARTMENT OF THE AIR FORCE WASHINGTON DC
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The United States Air Force proposes to deploy a Second KC-135R Air Refueling Squadron consisting of 14 additional tanker aircraft, at Malmstrom AFB, Montana. The aircraft will arrive in late 1991 and will bring the total number of assigned KC-135R aircraft to 30. Except for normal localized traffic patterns, the aircraft will fly more than 3,000 feet above ground, using existing established and approved airways and routes. Because no other ...


Ox Mountain Sanitary Landfill Apanolio Canyon Expansion Site, San Mateo County, California. Volume 1. Final EIS (Environmental Impact Statement) and Response to Comments APR 89
Authors:  HARDING-LAWSON ASSOCIATES NOVATO CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Contents: Summary; Introductions; Proposed Action and Alternatives; Affected Environment; Geology, Soils and Seismicity; Hydrology and Water Quality; Biology; Transportation and Circulation; Air Quality; Noise; Public Health and Safety; Public Facilities and Services; Cultural Resources; Aesthetics; Land Use Plans and Policies; Economics; Environmental Consequences: Geology-Soils and - Seismicity; Hydrology and Water Quality; Biology; Transportation; Air Quality; Noise; Public Health and Safety; Public Facilities and Services; Cultural Resources; Aesthetics; Land Use Plans ...


Environmental Impact Statement, Pease Air Force Base Closure 89 60 pages
Authors:  DEPARTMENT OF THE AIR FORCE WASHINGTON DC
The full text of this report is available for sale.A congressionally chartered Commission selected by the Secretary of Defense has proposed closing Pease Air Force Base (AFB), New Hampshire. This proposed action will involved the deactivation of the 509th Bombardment Wing, which presently consists of 21 FB-111 aircraft, 13 KC-135A tanker aircraft, and other operational and support units. The 132d Air Refueling Squadron of the Air National Guard (ANG) that is assigned to Pease AFB and consists of 10 ...


Stability and Microtox Response of Butenyltin Compounds 89
Authors:  C. A. Dooley; J. P. Testa Jr; NAVAL OCEAN SYSTEMS CENTER SAN DIEGO CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Tributenyltin bromides containing at carbon atoms C-1, C-2 or C-3 were synthesized from symmetrical tetrabutenyltins. Although all three tetrabutenyltin compounds were stable, only the tributenyltin bromides with double bonds at C-1 and C-3 were sufficiently stable for further studies. In aqueous sodium bromide (NaBr) solution containing 1% acetone, tri-1-butenyltin bromide was more stable in sunlight than tri-3-butenyltin bromide, yet neither compound was as stable as tributyltin bromide. Stability in seawater, ...


Draft Environmental Impact Statement. Space Shuttle Advanced Solid Rocket Motor Program DEC 88 423 pages
Authors:  NATIONAL AERONAUTICS AND SPACE ADMINISTRATION WASHINGTON DC
The full text of this report is available for sale.The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRMs. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of ...


Final Environmental Impact Statement. F-15E Beddown at Seymour Johnson AFB, North Carolina 18 NOV 88 129 pages
Authors:  DEPARTMENT OF THE AIR FORCE WASHINGTON DC
The full text of this report is available for sale.The Air Force proposes to convert the 72 F-4 aircraft at Seymour Johnson AFB with 72 LANTIRN equipped F-15E aircraft. The replacement would begin in January 1989 and be completed by 1991. The action would not result in an increase in overall sorties at the base, but would increase the number of operations currently flown between sunset and 10:30 P.M. from five up to eighteen per day. There would also ...


Final Environmental Impact Statement: F-15E Beddown at Seymour Johnson AFB, North Carolina 18 NOV 88
Authors:  TACTICAL AIR COMMAND LANGLEY AFB VA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Air Force proposes to convert the 72 F-4 aircraft at Seymour Johnson AFB with 72 LANTRIN equipped F-15E aircraft. The replacement would be completed by 1991. The action would not result in an increase in overall sorties at the base, but would increase the number of operations currently flown between sunset and 10:30 P.M. from five up to eighteen/day. There would also be an increase in the number of ...


Increased Sensitivity in Measurement of Butyltins in Seawater NOV 88
Authors:  Martha O. Stallard; Peter F. Seligman; Cesar Clavell; NAVAL OCEAN SYSTEMS CENTER SAN DIEGO CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This study describes modifications to an existing method for measuring n-butyltins that result in greatly increased sensitivity. The absolute detection limits of the cationic species are 80-180 pg. This increased sensitivity, yielding a 0.2-0.4 ng/L environmental detection limit is achieved by using a closed end quartz furnace and silanizing the glass cryogenic trap. Marine fouling, Environmental impact statement, Tin compounds, Butyl radicals. (mjm)


South Fork Zumbro River Stage 1B, Rochester, Minnesota (Supplement Number 1 to Design Memorandum Number 2 and Environmental Assessment) NOV 1988 283 pages
Authors:  CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT
The full text of this report is available for sale.This supplement to the design memorandum for Stage 1B of the Rochester Flood Control Project investigates aesthetic and recreational concerns and environmental issues not addressed in the environmental impact statement, which includes impacts caused by a proposed drawdown of Silver Lake and the discovery of contaminated waste.


Feasibility Report and Environmental Impact Statement for Navigation Improvements at Bayou La Batre, Alabama. Volume 2. Appendices 12 SEP 88
Authors:  John K. Graham; Evelyn Brown; Susan I. Rees; CORPS OF ENGINEERS MOBILE AL COASTAL SECTION
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Contents: Public Involvement, Local Cooperation and Coordination; Economic Analysis; Institutional, Financial and Cost Recovery Analysis; Environmental Compliance; Engineering Data and Cost Estimates. Keywords: Channels (waterways), Dredging. (FR)


Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem Including Santiago Creek. Main Report and Supplemental Environmental Impact Statement AUG 88
Authors:  ARMY ENGINEER DISTRICT LOS ANGELES CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Santa Ana River Mainstem Project, including Santiago Creek, is designed to provide urban flood protection to the growing communities in Orange, Riverside, and San Bernardino counties. The project will provide various levels of flood protection ranging from 100-year to 190-year in areas most susceptible to damages from floodflows for over 2 million people and businesses within the three-county area. Most of the development is in the Lower Santa Ana ...


Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 6. Santiago Creek AUG 88
Authors:  ARMY ENGINEER DISTRICT LOS ANGELES CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This volume accompanies the main report and supplemental environmental impact statement for the Phase II General Design Memorandum for the Santa Ana River Mainstem including Santiago Creek and contains the general design for the Santiago Creek. The recommended plan for Santiago Creek consists of modifying the existing gravel pits for flood control storage, constructing an outlet structure from the gravel pits with a release capacity of 3500 cu ft/s and ...


Flight Operations in the Sells Airspace Overlying the Tohono O'Odham Indian Reservation and Organ Pipe Cactus Nat'l Monument. Volume 2 AUG 88 266 pages
Authors:  TACTICAL AIR COMMAND LANGLEY AFB VA
The full text of this report is available for sale.The Air Force flies supersonic flight operations in the Sells Military Operations Area (MOA)/Air Traffic Control Assigned Airspace (ATCAA). Review of the existing supersonic waiver to conduct supersonic flight operations below 30,000 feet was accomplished. Several alternatives were reviewed to include the 'no-action' option. These alternatives were broken down into low altitude flight training and Sells Airspace supersonic training sections. In the low altitude section, the RDEIS reviewed establishing flying ...


Sampling, Testing, and Test Interpretation of Dredged Material Proposed for Unconfined, Open-Water Disposal in Central Puget Sound. Volume 5. Evaluation Procedures Technical Appendix. Phase 1 JUN 88
Authors:  Keith Phillips; David Jamison; John Malek; Brian Ross; Catherine Krueger; EVALUATION PROCEDURES WORK GROUP SEATTLE WA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This final environmental impact statement evaluates alternatives considered in identifying preferred sites for disposal of dredged material in Central Puget Sound. Three public multi-user disposal sites (Commencement Bay, Elliott Bay, and Port Gardner) are indentified for use based on a site selection process which considered several alternative sites. Alternative biological effects conditions for site management have been considered and a site condition identified for purposes of dredged material management at ...


Puget Sound Dredged Disposal Analysis (PSDDA). Unconfined, Open-Water Disposal Sites for Dredged Material. Phase 1 (Central Puget Sound). National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) JUN 88
Authors:  CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This final environmental impact statement evaluates alternatives considered in identifying preferred sites for disposal of dredged material in Central Puget Sound. Three public multiuser disposal sites (Commencement Bay, Elliott Bay, and Port Gardner) are identified for use based on a site selection process which considered several alternative sites. Alternative biological effects conditions for site management have been considered and a site condition identified for purposes of dredged material management at ...


Puget Sound Dredged Disposal Analysis (PSDDA). Management Plan Report (MPR), Unconfined, Open-Water Disposal of Dredged Material. Phase 1 (Central Puget Sound) JUN 88
Authors:  CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This final environmental impact statement evaluates alternatives considered in identifying preferred sites for disposal of dredged material in Central Puget Sound. Three public multiuser disposal sites (Commencement Bay, Elliott Bay, and Port Gardner) are identified for use based on a site selection process which considered several alternative sites. Alternative biological effects conditions for site management have been considered and a site condition identified for purpose of dredged material at the ...


Disposal Site Selection. Technical Appendix - Phase 1 (Central Puget Sound). Volume 3 JUN 88
Authors:  CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This document is a technical appendix to the Puget Sound Dredged Disposal Analysis (PSDDA) Management Plan Report and Final Environmental Impact Statement for the Phase I study area (central Puget Sound). The appendix was prepared by the Disposal Site Work Group (DSWG), assigned the responsibility for identifying potential unconfined, open-water dredged material disposal sites. Part I of the Disposal Site Selection Technical Appendix contains introductory and conceptual information for the ...


Clean Up of Uruno Beach, Guam 24 MAR 88
Authors:  STRATEGIC AIR COMMAND OFFUTT AFB NE
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The U.S. Air Force is proposing to cleanup Uruno Beach, which is a parcel of land of about 431.06 acres belonging to the Artero family in Guam. This property was used as a dumping site by the military during and after World War II. The debris consists of tires, aircraft parts, rusted drums, scrap metal, pots, pans, vehicle parts, AN-M50 series incendiary bomblets, M-89 and 90 target identification bombs, small ...


Research and Development: Procedures for Implementing NEPA 04 MAR 1988 20 pages
Authors:  Pat M. Stevens Iv; CORPS OF ENGINEERS WASHINGTON DC
The full text of this report is available for sale.This regulation provides guidance for implementation of the procedural provisions of the National Environmental Policy Act (NEPA) for the Civil Works Program of the US Army Corps of Engineers. It supplements Council on Environmental Quality (CEQ) regulations 40 CFR 1500-1508, November 29, 1978, in accordance with 40 CFR 1507.3, and is intended to be used only in conjunction with the CEQ regulations. Appendix A provides guidance on processing NEPA documents ...


Oakland Harbor. Deep-Draft Navigation Improvements. Design Memorandum Number 1, General Design and Final Supplement 1 to the Environmental Impact Statement, Alameda County, California MAR 88
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Supplement 1 to the Final Environmental Impact Statements for improving the Oakland Outer and Oakland Inner harbor channels. Channels would be widened in some areas and deepened to -42 feet MLLW. Sediment accumulation at the selected in-Bay disposal site and adjacent to Alcatraz Island has required the consideration of other disposal sites and disposal alternatives. The selected plan would remove 6.5 million cubic yards of material from the Federal Channels. ...


Draft Environmental Impact Statement: F-15E Beddown at Seymour Johnson AFB, North Carolina MAR 88
Authors:  TACTICAL AIR COMMAND LANGLEY AFB VA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Air Force proposes to convert the 72 F-4 aircraft at Seymour Johnson AFB with 72 LANTIRN equipped F-15E aircraft. The replacement would begin in 1989 and be completed 1991. The action would not result in an increase in overall sorties at the base, but would increase the number of operations currently flown between sunset and 10:30 P.M. from five up to eighteen/day. There would also be an increase in ...


Risk Analysis in Support of the Chemical Stockpile Disposal Program. Volume 1. Analysis 17 DEC 87
Authors:  Willard E. Fraize; Robert Cutler; William Duff; Eugenia Hughitt; John Perry; MITRE CORP MCLEAN VA CIVIL SYSTEMS DIV
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This document has been prepared for the U.S. Army to support the Final Programmatic Environmental Impact Statement for the Chemical Stockpile Disposal Program (CSDP). This report presents the results of the integrated risk analysis of the CSDP - a continuation of the 'risk analyses' prepared by GA technologies Inc. for this same program. This report describes the risk analysis methodology, and presents the results of the risk analysis in a ...


Supplemental Environmental Impact Statement. Supplement 2 NOV 87
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This Supplemental Environmental Impact Statement (Supplement II) has been prepared to examine the environmental impacts associated with the barrier features of the New Orleans to Venice, Louisiana, Hurricane Protection project. Four Environmental Assessments and associated Findings of No Significant Impact have been prepared in conjunction with minor work on other project segments. The purpose of this supplement is to evaluate an environmentally preferable and less costly alternative to the barrier ...


Clam Shell Dredging in Lakes Pontchartrain and Maurepas, Louisiana. Volume 1. Final Environmental Impact Statement and Appendixes NOV 87
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This final environmental impact statement assesses the impacts of clam shell dredging in Lakes Pontchartrain and Maurepas, Louisiana as permitted under 5-year permits issued in 1982 that will expire in December 1987. The document also assesses the impacts of proposed 10-year permit extensions that would allow shell dredging to continue under the same conditions. Clam shells (Rangia) have been harvested from the lakes area since 1933 by means of hydraulic ...


Chemical Stockpile Disposal Program. Evaluation of the Draft Programmatic Environmental Impact Statement for the Destruction of Chemical Munitions Stored at the Umatilla Army Depot and Other Army Facilities OCT 87
Authors:  UMATILLA COUNTY SOIL AND WATER CONSERVATION DISTRICT PENDLETON OR
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report was produced by concerned citizens in the area of the Umatilla Army Depot (UMDA) where the Army has proposed to build an incinerator to dispose of chemical agent stored at UMDA. The report addresses areas of concern which the citizens identified and makes a series of recommendations as to how the chemical agent (GB, VX and HD) at UMDA might be disposed of.


Environmental Gradient Analysis, Ordination, and Classification in Environmental Impact Assessments SEP 87
Authors:  Anthony J. Krzysik; CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report develops the theoretical foundation for analytical description and quantification of habitat structure. The analytical description of environmental gradients is shown to be an eigenanalysis problem, mathematically equivalent to the largest eigenvector (or first principal component) of a principal components analysis. The analytical representation of an environmental gradient, itself a single variable, is empirically demonstrated to have similar ecological information as the combination of all the original 58 habitat ...


Environmental Impact Statement for the New San Clemente Project, Monterey County, California - Regulatory Permit Application Number 16516S09. Appendices SEP 87
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This report consists of six Appendices. Topics include: Description of Carmel Valley simulation model; List of technical support documents; Avian survey and bird list; reptile and amphibian list; mammal list; plant list; riparian zone mitigation plan; State and federal air quality standards; Population and employment projections; Archaeological report.


Environmental Impact Statement for the New San Clemente Project, Monterey County, California - Regulatory Permit Application Number 16516S09 SEP 87
Authors:  CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Joint State/Federal environmental impact document is concerned with a regulatory permit application by the Monterey Peninsula Water Management District under Section 404 of the Clean Water Act. The proposed project involves construction of a dam across the Carmel River for the purpose of water supply (M&I), drought protection, and restoration of the environmental quality of the river.


Strategic Defense Initiative Demonstration/Validation Program Environmental Assessments Summary AUG 87
Authors:  G. Brown; STRATEGIC DEFENSE INITIATIVE ORGANIZATION WASHINGTON DC SYSTEMS ENGINEERING
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The Strategic Defense Initiative Organization (SDIO) and its proponents (the U.S. Army and U.S. Air Force) plan to conduct Demonstration/ Validation tests of the six technologies to demonstrate their respective ability to perform their required tasks, and to validate the requirements to determine their feasibility for a future decision on whether to proceed with Full-Scale Development. Demonstration/Validation tests would be conducted at 14 government facilities across the United States and ...


New Orleans to Venice, Louisiana, Hurricane Protection Project: Draft Fish and Wildlife Coordination Act Report on Reach C and Barrier Features. Supplement 2. Supplemental Environmental Impact Statement. Appendixes AUG 87
Authors:  Thomas C. Michot; Kim M. Bettinger; ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.Presented are the findings and recommendations of the Fish and Wildlife Service relative to the New Orleans to Venice, Louisiana, Hurricane Protection Project (Reach C and the Barrier Feature). This project was authorized by the Flood Control Act of October 23, 1962, for the purpose of providing hurricane protection to the developed areas of Plaquemines Parish along the Mississippi River below New Orleans. This is to be accomplished via upgrading ...


New Orleans to Venice, Louisiana, Hurricane Protection Project: Draft Fish and Wildlife Coordination Act Report on Reach C and Barrier Features. Supplement 2. Supplemental Environmental Impact Statement AUG 87
Authors:  ARMY ENGINEER DISTRICT NEW ORLEANS LA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.The purpose of this supplement is to evaluate an environmentally preferable and less costly alternative to the barrier plan presented in the original FEIS.The project, authorized by Congress in 1962, would provide protection from hurricane induced tidal overflow to the developed area of lower Plaquemines Parish, Louisiana. The protection is to be achieved by increasing the height of existing levees and by modifying current drainage facilities. Construction began in 1966 ...


A Negative Impact Report of a Cultural Resources Survey of Donaldson Point, Dike 5, New Madrid County, Missouri JUL 87 13 pages
Authors:  Jimmy D. McNeil; ARMY ENGINEER DISTRICT MEMPHIS TN
The full text of this report is available for sale.A pedestrian survey failed to locate any prehistoric, historic, or architectural sites within the project right-of-way.


Total Results: 629 Pages: Previous 1 2 3 4 [5] 6 7 8 9 10 11 Next Results per page: