| Environmental Control Technology. |
11 NOV 1974 |
|
| Authors:
ATOMIC ENERGY COMMISSION WASHINGTON D C
|
 | This report addresses primarily the environmental control aspects of coal combustion and conversion and attempts to i)identify these air, water, and solid effluents resulting from these processes that require control, ii)describe the current status of control technology, and iii)present a program and budget to be used as a basis for ERDA planning. Some suggestions that may be useful in planning the management structure of ERDA are also included. (Author). |
|
| NIKE-APACHE PHOTOMETRIC (SR-034) (13 JUNE 1966). |
JUL 1966 |
|
| Authors:
Gordon L. Dunaway; ARMY ELECTRONICS COMMAND WHITE SANDS MISSILE RANGE NM ATMOSPHERIC SCIENCES L AB
|
 | Meteorological data gathered for the launching of Nike-Apache Photometric (SR-034) are presented for future ballistic studies. The meteorological data and resulting ballistic data appear in tabular form. |
|
| AEROSPACE GROUND EQUIPMENT ENGINEERING ANALYSIS REPORT VOLUME III. LAUNCH CONTROL SYSTEMS. |
31 DEC 1962 |
|
| Authors:
LOCKHEED MISSILES AND SPACE CO INC SUNNYVALE CA
|
 | This report consists of: (1) a general description of Launch Control Systems (LCS) operations, functions, and equipment at both Complexes 75-3 and 75-1; (2) diagrams illustrating equipment locations; and (3) a technical analysis of all Launch Control Systems equipment used at Launch Complexes 75-3 and 75-1, describing the design functions, and location. To avoid duplication of information, reference is made to the equipment of Launch Complex 75-1 only as it ... |
|
| VAFB ACCEPTANCE/DEMONSTRATION PROGRAM PLAN, |
16 APR 1962 |
|
| Authors:
G.B. Webb; BOEING CO SEATTLE WASH
|
 | The purpose of this document is to define the tasks, data, delivery, and procedures required to accomplish the Acceptance and Delivery/Turnover activities for the Minuteman facilities at Vandenberg Air Force Base (VAFB) in accordance with the approved AFBSD Exhibit 61-65. The document applies to the WS-133A sites and training facilieing activated by the Integrating Contractor (Boeing). With Air Force concurrence, through approval of the Air Force Contracting Officer, this document ... |
|