Storming Media: Pentagon Reports and DocumentsPentagon Reports: Fast. Definitive. Complete.     
New Account »
Forgot Password?
Advanced Search »

Newsletter
Unsubscribe »
Reports by Author

D. McLaughlin


Click on the titles below to find US government-authored or -collected reports written by D. McLaughlin

Total Results: 3 Results per page:
Sort by: Title Date Desc Pages Display:
Support of the Characterization of the LB/TS (Large Blast/Thermal Simulator) Facility 01 AUG 85
Authors:  I. B. Osofsky; G. P. Mason; D. T. Hove; D. McLaughlin; SCIENCE APPLICATIONS INTERNATIONAL CORP HERMOSA BEACH CA
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.A fast acting valve was designed. A valve motion model was developed. The effects of valve opening and closing time on shock tube performance was determined. Wave shaping was attained by controlling the closing of the valve after initial opening. Driver and valve design trade studies and valve designs were made. Designs were made for automatic loading diaphragm systems. Cryogenic and compressed air driver systems were studied and designed. Heated ...


CERAMIC APPLICATIONS IN THE DIESEL ENGINE JUL 78
Authors:  D. McLaughlin
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.A wide ranging investigation has been made of the potential of reaction bonded and hot-pressed silicon nitride components in diesel engines. These have ranged from stationary high-thermal stress items such as 'hot plugs' (combustion pre-chamber liners), to dynamic items such as turbocharger rotors. The results of these trials have been sufficiently encouraging to indicate that for the small indirect-injection automotive type of engine there are desirable gains to be had ...


Overhaul Work Booklet: USS Rathburne (FF-1057), AUG 1977
Authors:  E. Bethke; D. McLaughlin; ARINC RESEARCH CORP ANNAPOLIS MD
The full text of this report is not available and therefore is not for sale. This information is provided for reference purposes only.This Overhaul Work Booklet for USS RATHBURNE (FF-1057) provides an overview of what the overhaul will encompass, letting each member of the Pearl Harbor Naval Shipyard team know what lies ahead and what he and other team members will contribute toward the successful accomplishment of overhaul objectives. The scheduled date for the overhaul is 26 August 1977 through 23 May 1978. (Author)


Total Results: 3 Results per page: