This report documents the results of Phase I, Study, of this five phase program. The objectives of this program are to develop an FTEPS design for an ATF aircraft and to design and fabricate a low cost FTEPS demonstrator with an integrated load simulator. The primary purpose of the program is to develop an electrical power generation and distribution system that can supply electrical power to the various critical systems ...
The primary purpose of the program is to develop an electrical power generation and distribution system that can supply electrical power to the various critical systems on the aircraft with a reliability and power quality level commensurate with the requirements of the loads. Phase II consisted of 4 task, Task I-FTEPS Demonstrator Basic Requirements, Task 2-Analysis, Task 3- FTEPS Demonstrator Conceptual Design, and Task 4-FTEPS Demonstrator Preliminary Design. In Task ...