| FALCON Pilot: Applying Open Standards for PLM Systems Interoperability |
26-Sep-2007 |
48 pages |
| Authors:
Raj Iyer; TACOM RESEARCH DEVELOPMENT AND ENGINEERING CENTER WARREN MI
|
 | This briefing discusses FALCON (Federated Army Lifecycle Collaborative Enterprise), a data exchange protocol that allows contractors access to Army vehicular product data from a range of engineering and logistics databases. Through FALCON, TARDEC can have access to a richer data set from original equipment manufacturers (OEMs). FALCON enables a route for improved data synchronization. FALCON enables use of simple add-on services via web-services. It provides a starting point for tracking ... |
|
| Visualization Enabled Product Lifecycle Management for Army Ground Systems Support |
29-May-2007 |
12 pages |
| Authors:
Raj Iyer; ARMY RESEARCH DEVELOPMENT AND ENGINEERING COMMAND WARREN MI
|
 | AGENDA: * Army PLM Objectives * Importance of product data * Product data challenges today * "As is" product data process with heterogeneous CAD * Visualization in a federated environment * Lattice 3D highlights * Additional requirements. PLM OBJECTIVES: To develop and integrate technology, processes and policy for the management of lifecycle product data from cradle to grave, using a federated architecture, standards for interoperability and enterprise integration, and to ... |
|
| Supporting Ground-Based Weapon Systems in the Battlefield |
08 DEC 2005 |
19 pages |
| Authors:
Raj Iyer; ARMY TANK-AUTOMOTIVE COMMAND WARREN MI
|
 | ARMY DEFINITION OF PLM: The integration of acquisition, technology and logistics systems and processes using open standards for interoperability among enterprise systems. Product Lifecycle Management (PLM) is the integration of engineering PLM and sustainment or logistics PLM. |
|
| Automated 2D to 3D CAD Conversions-- Myth or Reality? |
24 MAR 2004 |
15 pages |
| Authors:
Raj Iyer; TACOM RESEARCH DEVELOPMENT AND ENGINEERING CENTER WARREN MI
|
 | These briefing charts discuss the computer aided design, including the need to move from 2D to 3D, issues with legacy data, decision factors, methodology, conversion issues and conclusions. |
|
| Standards-Based Product Lifecycle Management -- STEP into PLM |
23 MAR 2004 |
17 pages |
| Authors:
Raj Iyer; ARMY TANK-AUTOMOTIVE COMMAND WARREN MI
|
 | What is PLM? Product Lifestyle Management (PLM) is an integrated information-driven approach to all aspects of a product's life, from its conceptual design through manufacture, deployment and maintenance--culminating in the product's removal from service and final disposal. PLM software suites enable accessing, updating, manipulating and reasoning about product information that is being produced in fragmented and distributed environment. Another definition of PLM is the integration of business systems to manage ... |
|
| Reuse of Legacy Data for Vehicle Support within the US Army |
22 OCT 2003 |
7 pages |
| Authors:
Raj Iyer; Jr. Adlam Arthur; Robert Culling; TACOM RESEARCH DEVELOPMENT AND ENGINEERING CENTER WARREN MI
|
 | The US Army Tank Automotive and Armaments Command (TACOM) supports combat and tactical vehicles for the Department of Defense. It is becoming increasingly important for the Army to acquire spare parts for existing vehicles cost effectively. New vehicle systems such as the Future Combat System must be developed in shorter time frames incorporating the very latest technologies available and using the latest modeling and simulation tools. Reusing valuable legacy data ... |
|