Watervliet Arsenal's (WVA's) chrome plating controls in its l2O-mm plating facility required enhancements and upgrades to improve efficiency and reduce operating costs. A site visit and preliminary investigation determined that system hardware needed modification. New designs were developed for the existing plating tank temperature loops and analog indicators were replaced with digital equipment. Scrubber instrumentation was calibrated, rectifier current loops were simplified, additional hardware was provided, and software was modified. ...
This report describes two projects conducted at Watervliet Arsenal (WVA), NY, during Fiscal Year 2000. The first project included an upgrade of the crane and hoist in the minor parts chrome plating facility. Another problem was the facility's existing chromic acid and electro-polish pumps, which were sealed pumps. The corrosive media, pressure, and high temperature in the process streams caused the pump seals to break frequently. The second project included ...
Watervliet Arsenal (WVA) and the U.S. Army Construction Engineering Research Laboratory (CERL) developed the Environmental Management Information System (EMIS) to supply the missing connections to the stand-alone systems already in place and in use. EMIS is an automated tracking system designed to provide "cradle-to-grave" tracking of hazardous materials and their chemical constituents. EMIS gathers environmental information throughout WVA and provides this information to compliance officers, ...