|
Abstract:
This Test Operations Procedure (TOP) establishes guidelines to use when performing a reliability, availability, maintainability, durability (RAM-D) and/or integrated logistic supportability (ILS) analysis during developmental testing. This document is intended for use in assessing RAM-D and ILS characteristics of various types of materiel, including individual items and systems.
| Limitations: |
APPROVED FOR PUBLIC RELEASE |
| Description: |
Final rept. |
| Pages: |
61 |
| Report Date: |
08-Sep-2008 |
| Report Number: |
A924684 |
|
|
|
|
|