|
Abstract:
The objective of the project is to be able to predict welding failures in real time and correct them as quickly as possible. This will be a drastic shift from the current statistically controlled manufacturing to dynamic model based manufacturing control.
| Limitations: |
APPROVED FOR PUBLIC RELEASE |
| Description: |
Progress rept. for 24 Jul 2007-31 Jan 2008 |
| Pages: |
3 |
| Report Date: |
FEB 2008 |
| Contract Number: |
N000140711133 |
| Report Number: |
A476674 |
|
|
|
|
|